
Projects · Featured work
Proof, built.
Hospitals, highways, schools, arenas, plants and neighborhoods. A selection of the projects that show how PerryWester builds.
Featured · HealthcareBehavioral Health and Crisis HospitalA 144-bed behavioral health hospital with a 24-hour crisis center, built ligature-resistant down to the last hinge and staffed for patients the day it opened.LocationU.S.Scale144 bedsDeliveryCM at-risk
Featured · FederalSecure Federal Operations and Records CenterA hardened operations floor, secure records vaults and redundant power and cooling for a federal mission that moved in without a single day offline.LocationU.S.Scale240,000 SFDeliveryDesign-build
Behavioral Health and Crisis HospitalA 144-bed behavioral health hospital with a 24-hour crisis center, built ligature-resistant down to the last hinge and staffed for patients the day it opened.
Nursing and Health Sciences Simulation CenterA teaching hospital in miniature: simulated ICU, operating and birthing suites with live medical gases and control rooms, ready for the first cohort in August.
Elementary School and Community Storm ShelterA 750-student elementary school whose gym doubles as a hardened storm shelter for the whole neighborhood, opened on the first day of the school year.
Police and Fire Training AcademyLive-fire burn buildings, a six-story drill tower, an emergency driving course and classrooms for police and fire recruits on one 64-acre campus.
Historic Theater Restoration and Fly TowerA 1920s movie palace restored plaster by plaster, with a new fly tower and rigging that let it host touring productions from its reopening night.
Indoor Track and Field FieldhouseA hydraulically banked 200-meter track under a long-span roof, built and certified for competition in time for its first indoor season.
Secure Federal Operations and Records CenterA hardened operations floor, secure records vaults and redundant power and cooling for a federal mission that moved in without a single day offline.
Life Science Lab and Office BuildingA speculative lab building with 16-foot floors, a shared vivarium and switchable lab or office floors, turned over ready for tenant fit-out on the date leases were signed.
Interchange Reconstruction and Flyover RampsFour new flyover ramps and a rebuilt interchange carrying traffic every day of construction, with every girder set in a planned overnight closure.
Air Traffic Control Tower and Base BuildingA 260-foot slipformed control tower and base building, built beside a live airfield and handed over for a controller transition that happened between two flights.
Surface Water Treatment PlantA 60 MGD treatment plant with ozone, membrane filtration and a new intake, producing drinking water that met every permit limit in its first week online.
Pharmaceutical Manufacturing PlantA sterile fill-finish plant with Grade A cleanrooms and clean utilities, qualified and validated inside the schedule so the first batch could be released on time.
Hydropower Station RehabilitationFour 1950s generating units rebuilt one at a time behind cofferdams, so the station kept producing power and every unit returned to the grid stronger than it left.
Combined-Cycle Generating StationA 1,100 MW combined-cycle plant built from the mat up: mass-concrete turbine pedestals, anchor bolts set to the millimeter and first fire on the date the grid operator booked.
District Energy Central PlantA central plant of chillers, thermal storage and boilers serving a downtown district, cut over to live buildings one loop at a time with no loss of heat or cooling.
Veterans Supportive HousingPermanent supportive homes for veterans with on-site case management, a clinic and a garden, finished and furnished so residents moved in with keys and a made bed.
Modular Apartment CommunityThree hundred twelve apartments built as finished volumetric modules, set six to eight a day and stitched together on site in half the usual time.
Graduate and Family Student HousingApartments for graduate students and their families with a child care center and courtyard play space, opened in phases so no lease ever started late.
Adaptive Reuse Mixed-Use QuarterFive brick warehouses turned into offices, apartments, a food hall and a public plaza, with century-old structure reinforced and new systems threaded through.No projects match these filters yet.

Start a conversation
Your project could be next.
Share the project, the site and the date that matters. A senior builder will come back to you within one business day.