Washington, D.C. · Building since 2021 Critical infrastructure · Heavy civil · Commercial buildings CareersMediaPrequalifyProject map
Commercial · 2024

Life Science Lab and Office Building

A speculative lab building where every floor can switch between wet labs and offices, turned over ready for fit-out on the day the leases were signed.

Owner
Confidential
Location
U.S.
Market
Commercial
Delivery
General contracting
Scale
280,000 SF
Completed
2024
The brief

A speculative lab building with 16-foot floors, a shared vivarium and switchable lab or office floors, turned over ready for tenant fit-out on the date leases were signed.

A speculative lab building has to anticipate tenants nobody has met. Floors needed 16-foot heights, vibration-stiff structure, generous shafts for exhaust and fume hoods, and capacity for chemical storage. The developer had leasing deadlines tied to financing, so the core, shell and central systems had to be complete and commissioned on a fixed date while tenant designs were still being drawn.

How we built it

The approach.

  1. 01

    Structure tuned for vibration

    Floor framing was checked against lab vibration criteria, and our crews placed slabs to tight flatness numbers for future equipment.

  2. 02

    Shafts sized for any tenant

    Exhaust, supply and utility shafts were sized for full lab use on every floor, with capped connections waiting at each level.

  3. 03

    The shared vivarium first

    The shared vivarium, with its demanding air and sanitation needs, was finished early so tenants could start research sooner.

  4. 04

    Fit-out ready on day one

    Tenant crews received a clean, commissioned shell and one point of contact for every utility tie-in.

The outcome.

280,000Square feet
16 ftFloor-to-floor height
100%Floors lab-ready
On dateShell turned over for fit-out

“We built for tenants nobody had met yet. Every capped pipe on every floor is a promise to one of them.”

Project executive, PerryWester
Commercial

Planning something like this?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.