Federal · 2025

Secure Federal Operations and Records Center

A hardened operations floor, secure records vaults and fully redundant power and cooling, delivered for a federal mission that could not go dark for a single day.

Owner
Confidential
Location
U.S.
Market
Federal
Delivery
Design-build
Scale
240,000 SF
Completed
2025
The brief

A hardened operations floor, secure records vaults and redundant power and cooling for a federal mission that moved in without a single day offline.

The agency was moving a round-the-clock operation and a large archive of sensitive records into a new building. The operations floor needed redundant power, cooling and communications. The records vaults needed fire suppression and environmental control that would not harm paper or media. Every worker needed a background check, construction security plans had to be approved in advance, and the mission had to cut over without a gap in operations.

How we built it

The approach.

  1. 01

    Security in the schedule

    Cleared workers, escort plans and controlled deliveries were planned before mobilization, so security never became a surprise delay.

  2. 02

    Redundancy proven, not assumed

    Generators, UPS and chillers were failed path by path in pull-the-plug tests while the floor ran under simulated load.

  3. 03

    Vaults conditioned before records

    Records vaults held their temperature and humidity setpoints for 45 days before the first box arrived.

  4. 04

    A parallel cutover

    The new operations floor ran in parallel with the old one for two weeks, and the agency moved over shift by shift.

The outcome.

240,000Square feet
2NPower and cooling paths
45 daysVault conditions proven
0Hours offline at cutover

“We pulled the main breaker with the floor fully loaded and watched it ride through. That is the test that lets an agency move in.”

Commissioning manager, PerryWester