Washington, D.C. · Building since 2021 Critical infrastructure · Heavy civil · Commercial buildings CareersMediaPrequalifyProject map
Buildings · Justice & Public Safety

Secure by design, secure by build.

Courthouses, detention centers, police and fire stations and emergency operations centers, built with the security and durability these buildings demand.

What owners need from us.

01

Security has no tolerance

Detention hardware, glazing and wall construction have to be installed exactly as specified. A gap in a secure perimeter is a failure.

02

Staff need to see

Sightlines from control rooms and housing pods keep officers and residents safe. Every wall and fixture is checked against them.

03

They operate around the clock

Public safety buildings never close. Renovations and expansions must keep dispatch, intake and response running.

Justice & Public Safety

What we build.

  1. 01

    Courthouses

    Courtrooms with separate public, staff and in-custody circulation and secure holding.

  2. 02

    Detention and correctional facilities

    Housing units, intake, sally ports and central control with detention equipment and electronics.

  3. 03

    Police and fire stations

    Stations, training facilities and apparatus bays built for fast response.

  4. 04

    Emergency operations and 911 centers

    Hardened buildings with redundant power and communications.

How we deliver here.

The capabilities owners in this market rely on most.

Design-BuildDeliver

One team for design, detention equipment and construction, with fewer handoffs.

Self-Performed ConstructionBuild

Grouted masonry and cast-in-place concrete for secure walls, built by our own crews.

Building SystemsBuild

Security electronics, door control and life safety tested together before turnover.

Virtual Design & ConstructionPlan

Sightline studies and embedded conduit coordinated in the model before walls go up.

In practice · Police and Fire Training Academy

Burn rooms proven with real fire.

At the police and fire training academy, the live-fire burn buildings were lined, instrumented and proven in controlled test burns with instructors reading the gauges. A six-story drill tower and an emergency driving course were built alongside, so the first recruit class trained on the full campus.

2
Live-fire burn buildings
6
Story drill tower
2025
Opened

Questions owners ask us.

Do you work with detention equipment contractors?

Yes. We bring detention equipment and security electronics into design early, coordinate embeds in the model and test every door before turnover.

Can you expand a facility that stays in operation?

We can. We phase work behind temporary secure perimeters, control tools and materials on site and coordinate every move with facility staff.

How do you protect sightlines during construction?

We check walls, fixtures and equipment against the design’s sightline studies in the model and again on site before finishes go in.

Justice & Public Safety

Planning a justice & public safety project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.