Buildings · K–12 Education

Ready for the first bell.

New schools, additions and renovations on occupied campuses, planned around summer break and the safety of every student and teacher.

What owners need from us.

01

Summer is short

Much of the work happens in a ten to twelve week window. Long-lead equipment and permits have to be in hand before the last day of school.

02

Children are next door

Additions and renovations often sit beside classrooms in session. Site separation, fencing and delivery hours protect students.

03

Safety is designed in

Secure vestibules, controlled entries and clear sightlines are part of every modern school and have to be built exactly as designed.

K–12 Education

What we build.

  1. 01

    New elementary, middle and high schools

    Complete campuses with classrooms, gymnasiums, cafeterias and athletic fields.

  2. 02

    Additions and modernizations

    Classroom wings and building system upgrades on occupied campuses.

  3. 03

    Secure entries and safety upgrades

    Secure vestibules, access control and hardware retrofits, often done over a single break.

  4. 04

    Career, technical and STEM spaces

    Shops, labs and makerspaces with the power, ventilation and equipment they need.

How we deliver here.

The capabilities owners in this market rely on most.

Construction ManagementDeliver

CM at-risk with a guaranteed maximum price set before the district votes.

Preconstruction & EstimatingPlan

Budgets that match the bond, with early bid packages for long-lead items.

Supply Chain ManagementPlan

Rooftop units, switchgear and hardware ordered early enough to land in summer.

Facilities & Transition ManagementOperate

Furniture, technology and staff move-in finished before teachers return.

In practice · Elementary School and Community Storm Shelter

A school by day, a shelter on the worst day.

The elementary school was delivered under CM at-risk with its gym built to the storm shelter standard. The hardened core went first because its inspections set the critical path, third-party inspections were booked pour by pour, and our crews moved the school in over one weekend before teachers arrived.

750
Students
1,500
Shelter occupants
2022
Opened with the school year

Questions owners ask us.

How do you keep students safe on an occupied campus?

Work zones are fenced and separated from student routes, deliveries avoid arrival and dismissal, and every worker is badged and screened to the district’s rules.

What happens if summer work runs late?

We plan so it does not. Long-lead items are bought before school lets out, and the summer schedule is reviewed daily against the first day of term.

Can you help a district plan a bond program?

Yes. Our preconstruction team prices options early so the district can set a bond amount that matches the work.