Hydropower Station Rehabilitation

Four generating units rebuilt one at a time behind cofferdams, while the station kept sending clean power to the grid.

Owner
Confidential
Location
U.S.
Market
Renewable Energy
Delivery
EPC
Scale
4 units / 120 MW
Completed
2025
The brief

Four 1950s generating units rebuilt one at a time behind cofferdams, so the station kept producing power and every unit returned to the grid stronger than it left.

The station’s four units were more than 70 years old and losing efficiency. Each had to be dewatered, dismantled, rebuilt with a new turbine, generator and controls, and returned to service while the other units kept running. The work happened inside a dam, with river flows, fish passage rules and environmental permits setting the window for every outage.

How we built it

The approach.

  1. 01

    Cofferdams and dewatering

    Each unit was isolated with stoplogs and a cofferdam and pumped dry, with instruments watching seepage and structure throughout.

  2. 02

    One unit at a time

    Only one unit was ever out of service, so the station kept producing power for the whole program.

  3. 03

    Heavy lifts inside the powerhouse

    The powerhouse crane was refurbished and load-tested first, then used to pull and set rotors, runners and stator sections.

  4. 04

    Returned to the grid tested

    Each rebuilt unit went through wet testing, balancing and load rejection tests before release back to the operator.

The outcome.

4Units rebuilt
120 MWStation capacity
3Units always online
0Permit violations

“We took apart a 70-year-old machine and put back a new one, and the river never knew we were there.”