Buildings · Sports & Entertainment

Built for opening night.

Arenas, stadiums, ballparks and entertainment venues, scheduled backwards from a date that has already been sold.

What owners need from us.

01

The date is non-negotiable

Schedules, tickets and broadcasts are set before construction starts. There is no option to open late.

02

Long spans, heavy picks

Roof trusses, scoreboards and seating bowls involve some of the biggest lifts in building construction.

03

Event day is the real test

Concessions, vertical transportation, broadcast and crowd flow all have to work with tens of thousands of people inside.

Sports & Entertainment

What we build.

  1. 01

    Arenas

    Multi-purpose bowls with long-span roofs, rigging grids and fast changeovers between events.

  2. 02

    Stadiums and ballparks

    Open-air venues with seating bowls, premium suites, field systems and lighting.

  3. 03

    Practice and training facilities

    Team buildings, training fields and performance centers.

  4. 04

    Renovations between seasons

    Premium seating, concourse and technology upgrades done in the off-season.

How we deliver here.

The capabilities owners in this market rely on most.

General ContractingDeliver

One contract and one schedule built backwards from the first event.

Self-Performed ConstructionBuild

Our own crews on the seating bowl concrete and structural steel.

Supply Chain ManagementPlan

Seats, scoreboards and roof steel tracked from the factory to the crane.

Facilities & Transition ManagementOperate

Test events and operator training before the doors open to the public.

In practice · Indoor Track and Field Fieldhouse

A banked track, certified before the season.

The fieldhouse was delivered design-build with a fixed meet calendar. Long-span roof trusses were assembled at grade and lifted in pairs, the track slab was surveyed after every pour, and the hydraulic banking was cycled under load before the surface went down and the track was certified.

210,000
Square feet
200 m
Banked track
2023
First home meet

Questions owners ask us.

How do you protect a fixed opening date?

The schedule is built backwards from the first event, with buffers on the critical path and early purchase of roof steel, seating and scoreboards.

How do you handle long-span roof erection?

We engineer the erection sequence, temporary shoring and crane picks in advance and rehearse major lifts before they happen.

Can you renovate a venue between seasons?

Yes. Off-season work is planned in tight windows, and anything that might run long is phased so the venue can still host events.

Sports & Entertainment

Planning a sports & entertainment project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.